BP’S BIG GREEN TRAIN: BENCHMARKING NEXT GENERATION LNG PLANT DESIGNS

机译:BP的大型绿色火车:将下一代下一代LNG工厂设计作为基准

获取原文
获取原文并翻译 | 示例

摘要

Through the Big Green Train Project, BP with KBR as the engineering contractor undertook an extensive program that evaluated key aspects of design and engineering of a Baseload LNG Liquefaction plant. The study results provided a high level of confidence that “Next Generation” LNG plant designs are achievable and that the industry standards will be raised for future LNG plants based on design, capacity, life cycle cost and green house gas emissions. BP set aggressive targets and the project team met these challenges through close collaboration between the owner, contractor and process licensor. rnThe Big Green Train plant designs were based on LIQUEFINTM liquefaction technology process that was developed by Axens/IFP, Institut Français du Pétrole. The project team set a program to determine if the other available liquefaction process technologies could deliver similar results. The team developed a benchmarking basis of design that contained sufficient level of detail on the design parameters without penalizing any of the LNG process technologies. Although this was a significant effort, it was required to ensure a fair and unbiased comparison of the technologies. This effort would not have been possible without the tremendous support of the LNG technology Licensors who participated. rnThis paper shows that any of the participating process Licensors’ technologies can be used for “Next Generation” LNG plants. While process technology has some influence on the cost of a LNG plant, success is really achieved by the owner/contractor project team working in conjunction with the process licensor toward common goals.
机译:通过大绿色火车项目,由KBR作为工程承包商的BP进行了广泛的计划,该计划评估了Baseload LNG液化厂设计和工程的关键方面。研究结果使人们高度相信“下一代” LNG工厂的设计是可以实现的,并且根据设计,容量,生命周期成本和温室气体排放,未来的LNG工厂将提高行业标准。 BP设定了积极的目标,项目团队通过所有者,承包商和流程许可方之间的密切合作来应对这些挑战。 rnBig Green Train工厂的设计是基于法国石油公司Axens / IFP开发的LIQUEFINTM液化技术工艺。项目团队制定了一个程序,以确定其他可用的液化工艺技术是否可以提供类似的结果。该团队开发了一个基准设计基准,其中包含有关设计参数的足够详细程度,而没有惩罚任何LNG工艺技术。尽管这是一项巨大的努力,但仍需要确保对技术进行公平,公正的比较。如果没有参加的LNG技术许可方的大力支持,这项工作将是不可能的。 rn本文显示,许可方的任何参与工艺都可以用于“下一代” LNG工厂。尽管工艺技术对液化天然气工厂的成本有一定影响,但所有者/承包商项目团队与工艺许可方共同朝着共同目标努力,才能真正取得成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号