Implementing and Improving the Mine Plan at the Mt Wright Project

机译:莱特山项目的实施和完善矿山计划

获取原文
获取原文并翻译 | 示例

摘要

The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold - a wholly owned subsidiary of Resolute Mining Limited. Underground Development of the current Mt Wright orebody commenced in June 2006 and the first production ore was brought to surface in June 2007. The orebody is a rhyolite pipe containing fine-grained disseminated gold in a granite host rock. Ground conditions tend to be good to excellent throughout development, with some minor deformation experienced when stope-sized excavations are formed. The mine commenced as a sublevel open stoping (SLOS) operation with the intent to utilise development waste to back fill isolated upper level stopes while developing to the bottom of the known orebody. The mine plan intended to commence production with a bottom-up primary/ secondary stoping retreat through the main orebody utilising cemented fill. Some challenges were faced during the initial production phase that included: 1.Ongoing underground diamond drilling and updating of the block model resulted in some issues reconciling the grade control results to the resource model. This was primarily due to the high variability of grade which in turn caused difficulties in accurately identifying areas of low and high-grade. 2.The cost of establishing and operating a cemented fill plant to achieve the planned extraction sequence of the orebody had increased significantly beyond initial estimations. 3.Geotechnical conditions such as stress orientations, ground behavior and response to the forming of excavations learned through the mining of the upper level stopes were different to the assumptions made during the initial design. A number of in-house and external reviews of the mining method were completed which has resulted in a revised mining plan. This paper will summarise the challenges faced and the implementation of the mine plan to date.
机译:莱特山项目位于北昆士兰州的拉文斯伍德镇附近,由Resolute Mining Limited的全资子公司Carpentaria Gold经营。当前的莱特山矿体的地下开发始于2006年6月,第一批生产矿于2007年6月浮出水面。该矿体是流纹岩管道,其在花岗岩基质岩石中包含细粒散布的金。在整个开发过程中,地面条件往往会好到极好,形成采场大小的开挖时会经历一些小的变形。该矿山开始于地下露天采矿(SLOS)作业,旨在利用开发废料回填隔离的上层露天矿,同时开采到已知矿体的底部。该矿山计划打算利用胶结填充物,通过自下而上的一次/二次采动退矿,通过主体矿体开始生产。在初始生产阶段面临一些挑战,其中包括:1.正在进行的地下钻石钻孔和块模型的更新导致了一些问题,这些问题使品位控制结果与资源模型保持一致。这主要是由于等级的高度可变性,这又导致在准确识别低等级和高等级区域方面遇到困难。 2建立和运营水泥填充厂以实现矿体的计划开采顺序的成本已大大超出了最初的估计。 3,岩土力学条件,例如应力方向,地面行为以及对通过采掘上层采场所学的开挖形式的响应,与初始设计中的假设不同。对采矿方法进行了许多内部和外部审查,从而修订了采矿计划。本文将总结迄今为止所面临的挑战和矿山计划的实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号