首页> 外文会议>10th International Conference on Advances in Power System Control, Operation amp; Management >Study on switching overvoltage in Fuhai offshore wind farm in Taiwan
【24h】

Study on switching overvoltage in Fuhai offshore wind farm in Taiwan

机译:台湾福海海上风电场的开关过电压研究

获取原文
获取原文并翻译 | 示例

摘要

In recent years, the development of offshore wind farms has increasingly become larger in scale. The integration of large-scale wind farms increases the potential risk to the stable operation of power grids. One of the challenges comes from the possible switching overvoltage of the power system in offshore wind farms because insulation accidents caused by overvoltage have become one of the prominent issues in wind farms. This work discusses the simulation results obtained from a number of switching scenarios in planning Fuhai offshore wind farm in Taiwan. These switching scenarios include breaker closing or opining with wind-farm cable and substation transformer at no load conditions, breaker opining when single-phase or three phase faults appears in the cable of the offshore wind farm. According to the simulation results, the switching overvoltage protection scheme in Fuhai offshore wind farm will be proposed in this study.
机译:近年来,海上风电场的发展规模越来越大。大型风电场的整合增加了电网稳定运行的潜在风险。挑战之一来自海上风电场可能会切换电源系统的过电压,因为由过电压引起的绝缘事故已成为风电场中的突出问题之一。这项工作讨论了在规划台湾福海海上风电场时从多种切换方案中获得的仿真结果。这些切换方案包括在空载条件下使用风电场电缆和变电站变压器合闸或合闸断路器,当海上风电场的电缆中出现单相或三相故障时,断路器合闸。根据仿真结果,本研究将提出福海海上风电场的开关过电压保护方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号