首页> 外文会议>10th International Conference on Advances in Power System Control, Operation amp; Management >Assessing the feasibility of the interconnected power market in Australia
【24h】

Assessing the feasibility of the interconnected power market in Australia

机译:评估澳大利亚互联电源市场的可行性

获取原文
获取原文并翻译 | 示例

摘要

Take into account the unique geographical location of Australia, there is a time difference of two hours between east and west coasts of the country. This means the peak of energy usage in the two regions will occur in two different time periods. This paper studies the feasibility of building a transmission line to connect the energy markets in both east and west Australia. A simplified market simulation model is developed to investigate the operation of the interconnected market. The market prices in different regions with and without the proposed interconnection will be calculated by the proposed simulation model.
机译:考虑到澳大利亚独特的地理位置,该国东西海岸之间存在两个小时的时差。这意味着两个区域中的能源使用高峰将在两个不同的时间段内发生。本文研究了建立一条传输线以连接澳大利亚东部和西部能源市场的可行性。开发了简化的市场模拟模型以研究互连市场的运作。带有和不带有建议的互连的不同区域的市场价格将由建议的仿真模型计算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号