In project construction process,cost control with quality and schedule control stands at the center of project management. Project cost control should start from offer of the project bid to the settlement when the project is completed,run through the whole process of project implementation. The level of cost management will directly determine the effect of cost control. In this paper,basic procedure of project cost management is systematically analyzed,including the detailed analysis of cost plan,cost accounting,cost analysis and cost assessment,etc. This paper focuses on the concrete methods of cost control and cost analysis with some project cases.