首页> 外国专利> Support equipment and support construction method

Support equipment and support construction method

机译:支护设备及支护施工方法

摘要

PROBLEM TO BE SOLVED: To provide a timbering device which can shorten the construction period by securing enough space for transportation and installation of materials, and be easily installed.;SOLUTION: A timbering device 3 supports a lining pipe 2 along an inner peripheral surface of an existing pipe 1. Timbering members 11 of the timbering device 3 are arranged in a circumferential direction of the inner peripheral surface of the lining pipe 2. A joint member 20 rotatably connects ends of the adjacent timbering members 11. The joint member 20 has a waling support part 24 to support a wale member 40. A bridging member 30 is strutted while being stretched between the ends on opposite side of the adjacent timbering members 11.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2019,JPO&INPIT
机译:需要解决的问题:提供一种支护装置,通过确保足够的材料运输和安装空间来缩短施工周期,并且易于安装。;解决方案:支护装置3沿现有管道1的内周边表面支撑衬管2。支护装置3的支护构件11布置在内衬管2的内周表面的圆周方向上。连接构件20可旋转地连接相邻支护构件11的端部。连接构件20具有支撑杆件40的杆件支撑部件24。在相邻支护构件11相对侧的两端之间拉伸时,支撑桥接构件30。;所选图纸:图1;版权所有:(C)2019年,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号