Pile construction method and pile construction management system

机译:桩施工法和桩施工管理系统

摘要

PROBLEM TO BE SOLVED: To provide a pile construction method and a pile construction management system capable of properly constructing piles, while suppressing period and cost required for a ground exploration, even in a case where a large number of piles are constructed in a large scale site, and the like.;SOLUTION: A pile construction method comprises: a support layer data forming step #1 of forming support layer data exhibiting whole aspect of support layers assumed in pile construction object areas from support layer depth information at ground exploration points; a pile length setting step #2 of setting pile length at each pile construction point on the basis of the support layer data formed in the support layer data forming step #1; and a support layer data updating step #5 of adding support layer arrival depth information of piles at each pile construction point that is sequentially obtained in pile construction work as the support layer depth information and updating the support layer data.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2019,JPO&INPIT
机译:要解决的问题:提供一种桩施工方法和能够正确构建桩的桩施工管理系统,同时抑制地面勘探所需的期间和成本,即使在大规模大量桩的构建的情况下网站等。解决方案:桩施工方法包括:形成支撑层数据的支撑层数据形成步骤#1,其形成在地面探索点的支撑层深度信息中呈现在桩结构区域区域中的支撑层的整个方面;在每个桩构造点的桩长设置步骤#2基于支撑层数据形成步骤#1的支撑层数据。和支持层数据更新的步骤#5添加支撑层到达的桩的支撑层到达深度信息在桩施工中顺序地获得的每个桩施工点作为支持层深度信息和更新支持层数据。;所选绘图:图1 ;版权:(c)2019,JPO和INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号