PROBLEM TO BE SOLVED: To provide a pile construction method and a pile construction management system capable of properly constructing piles, while suppressing period and cost required for a ground exploration, even in a case where a large number of piles are constructed in a large scale site, and the like.;SOLUTION: A pile construction method comprises: a support layer data forming step #1 of forming support layer data exhibiting whole aspect of support layers assumed in pile construction object areas from support layer depth information at ground exploration points; a pile length setting step #2 of setting pile length at each pile construction point on the basis of the support layer data formed in the support layer data forming step #1; and a support layer data updating step #5 of adding support layer arrival depth information of piles at each pile construction point that is sequentially obtained in pile construction work as the support layer depth information and updating the support layer data.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2019,JPO&INPIT
展开▼