首页> 外国专利> Operations planning facility, operations planning process and operations planning program

Operations planning facility, operations planning process and operations planning program

机译:运营规划设施,运营规划流程和运营计划计划

摘要

A period dividing unit (121) divides, from a planned period, a non-specified period for which an operation plan has not been specified, into a specification target period and a period subsequent to the specification target period. A tentative-solution decision problem generation unit (122) generates a tentative-solution decision problem, which is an optimization problem obtained by fixing, as a fixed value, a value of a decision variable for a fixed period of time, among a plurality of decision variables, included in a reference problem which is an optimization problem for setting the operation plans of the plurality of power producers. A sub-defining unit (123) solves the preliminary solution decision problem, thereby finding a solution of a decision variable for the setting target period as a new set value.
机译:周期划分单元(121)从计划期间划分,其中未指定操作计划的非指定时段,以指定目标期间和在规范目标期间之后的时间段内。 暂定 - 解决方案决策问题生成单元(122)生成暂定解决方案决策问题,这是通过将多个时间段的固定时间段的确定变量的值,例如固定时间值来获得的优化问题,其中多个 决策变量包括在参考问题中,这是用于设置多个电力生产者的操作计划的优化问题。 子定义单元(123)解决了初步解决方案决策问题,从而找到了设置目标时段的决策变量作为新设定值的解决方案。

著录项

  • 公开/公告号DE112019007201T5

    专利类型

  • 公开/公告日2021-12-30

    原文格式PDF

  • 申请/专利权人 MITSUBISHI ELECTRIC CORPORATION;

    申请/专利号DE20191107201T

  • 发明设计人 HIDEYA SHIBATA;RYUYA MATSUNAGA;

    申请日2019-05-13

  • 分类号G06Q10/06;G06Q10/04;G06Q50/06;

  • 国家 DE

  • 入库时间 2022-08-24 23:08:53

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号