首页> 外国专利> SYSTEMS AND METHODS UTILIZING AC OVERBUILT RENEWABLE ELECTRIC GENERATION RESOURCE AND CHARGE STORAGE DEVICE

SYSTEMS AND METHODS UTILIZING AC OVERBUILT RENEWABLE ELECTRIC GENERATION RESOURCE AND CHARGE STORAGE DEVICE

机译:利用AC过度核算可再生发电资源和电荷存储设备的系统和方法

摘要

An integrated renewable energy source (RES) and energy storage system (ESS) facility configured to supply power to an AC electric grid includes energy storage system capacity and inverter capacity that are larger than a point of grid interconnect (POGI) limit for the facility, enabling high capacity factors and production profiles that match a desired load. At least one first DC-AC power inverter is associated with RES, and at least one second AC-DC power inverter is associated with the ESS. AC-DC conversion is used when charging the ESS with RES AC electric power, and DC-AC conversion utility is used when discharging ESS AC electric power to the electric grid. Aggregate DC-AC inverter utility exceeds the facility POGI limit, and excess RES AC electric power may be diverted to the second inverter(s).
机译:集成的可再生能源(RES)和储能系统(ESS)设施,用于向AC电网供电,包括能量存储系统容量和变频器容量大于该设施的网格互连(Pogi)限制的点, 启用匹配所需负载的高容量因子和生产型材。 至少一个第一DC-AC电源逆变器与RE相关联,并且至少一个第二AC-DC功率逆变器与ESS相关联。 使用RES AC电力充电时使用AC-DC转换,并在将ESS AC电力放电到电网时使用DC-AC转换实用程序。 聚合DC-AC逆变器实用程序超过设施Pogi极限,多余的RES交流电力可以转移到第二逆变器。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号