首页>
外国专利>
Traffic Control Reduction Rapid Packaging Method Due to Ground Deposition on Roads
Traffic Control Reduction Rapid Packaging Method Due to Ground Deposition on Roads
展开▼
机译:道路上地面沉积导致的交通控制减少快速包装方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a rapid paving method for reducing traffic control on a road surface due to ground subsidence, and determines a repair method according to the condition of ground subsidence, and promptly repairs or temporarily paves a precast concrete panel by lifting and grouting according to the decision. It aims to reduce traffic control by carrying out maintenance work during times of low traffic volume while simultaneously performing maintenance work. The rapid paving method for reducing traffic control on the road surface due to ground subsidence according to the present invention is a repair method using the lifting of the existing precast concrete panel (1) because the ground subsidence section is narrow, and one side is inclined downward due to ground subsidence. A first step of mounting the lifting frame 10 along the perimeter of the cast concrete panel (1); a second step of connecting the lifting frame to a lowered place among the precast concrete panels; a third step of lifting the downwardly inclined portion of the precast concrete panel through the lifting frame and setting it to the same height as the surrounding driving road surface; a fourth step of supporting the precast concrete panel by filling a grout material through the precast concrete panel in the underground cavity formed at the bottom of the precast concrete panel through the third step; and a fifth step of separating the lifting frame from the precast concrete panel after completing the fourth step.
展开▼