首页> 外国专利> SYSTEMS AND METHODS FOR INFRASTRUCTURE MANAGEMENT SYSTEM BASED POWER SOURCING EQUIPMENT POWER ALLOCATION

SYSTEMS AND METHODS FOR INFRASTRUCTURE MANAGEMENT SYSTEM BASED POWER SOURCING EQUIPMENT POWER ALLOCATION

机译:基于基于基于基于基于基于基于基础设施管理系统的系统和方法

摘要

In one embodiment, a system manager for a network management system comprises: a PSE power management function implemented by a processor; and a cabling information database; wherein the PSE power management function is configured to couple to a power sourcing network switch via a network; wherein the PSE power management function, in response to a request to allocate power from the switch to a network powered device: determines a length of cabling for instances of network cabling that couples the network switch to the network powered device based on network cable length information stored in the cabling information database; determines a power loss based on the length of cabling; and transmits a power allocation command to the network switch to allocate a power level to a network port coupled to the network powered device based on the power loss and a power class of the network powered device.
机译:在一个实施例中,用于网络管理系统的系统管理器包括:由处理器实现的PSE电源管理功能; 和布线信息数据库; 其中,PSE电源管理功能被配置为通过网络耦合到电源采购网络交换机; 其中PSE电源管理功能响应于从交换机到网络供电的请求:确定基于网络电缆长度信息将网络交换机连接到网络供电设备的网络电缆的电缆长度的长度 存储在布线信息数据库中; 根据电缆长度确定功率损耗; 并将电力分配命令发送到网络交换机以基于网络供电设备的功率丢失和功率等级将功率电平分配给耦合到网络供电设备的网络端口。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号