首页> 外国专利> Steel pipe pile with excavation jig and rotary press fit method of steel pipe pile

Steel pipe pile with excavation jig and rotary press fit method of steel pipe pile

机译:钢管桩与挖掘夹具夹具和旋转压配合法的钢管桩

摘要

PROBLEM TO BE SOLVED: To provide a method to consecutively perform an installation of a mouth pipe and driving of a steel pipe pile.;SOLUTION: A rotary press-in method of a steel pipe pile comprises: a first process (P1) to engage a half-split excavation jig, which have a first and a second half cylindrical member each provided with spiral blade members, to the steel pipe pile attached to a pile driver; a second process (P2) to attach the steel pipe pile engaged with the half-split excavation jig to a mouth pipe; a third process (P3) to rotary press-in the mouth pipe in synchronization with rotation of the steel pipe pile engaged with the half-split excavation jig; a fourth process (P4) to excavate soil in the mouth pipe with the steel pipe pile engaged with a half-split excavation jig; a fifth process (P5) to rake out soil deposited between the spiral blade members after lifting up the steel pipe pile engaged with the half-split excavation jig; and a sixth process (P6) to rotary press-in the steel pipe pile in a place where the mouth pipe is pressed-in after the half-split excavation jig is removed from the steel pipe pile.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2019,JPO&INPIT
机译:要解决的问题:提供一种连续执行嘴管管道的装置和钢管桩的驱动的方法。解决方案:钢管桩的旋转压力机方法包括:第一工艺(P1)接合半拆开挖掘夹具,其具有各自设置有螺旋叶片构件的第一和第二半圆柱形构件,钢管桩附接到桩筒;第二种方法(P2)连接钢管桩与半分割挖掘夹具接合到口管;第三种工艺(P3)与钢管桩的旋转与半拆开挖掘夹具的旋转相同步的旋转压入口管;第四个过程(P4)用钢管桩挖掘口管中的土壤,钢管桩与半拆开挖掘夹具啮合;第五工艺(P5)在抬起螺旋叶片构件之间沉积的土壤,抬起钢管桩与半拆开挖掘夹具啮合;在从钢管桩中除去半分割挖掘夹具后,将钢管桩旋转压力 - 在钢管桩中的钢管桩中的第六个工艺(p6)。;所选绘图:图1;版权:(c)2019,JPO和INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号