首页>
外国专利>
Steel pipe pile with excavation jig and rotary press fit method of steel pipe pile
Steel pipe pile with excavation jig and rotary press fit method of steel pipe pile
展开▼
机译:钢管桩与挖掘夹具夹具和旋转压配合法的钢管桩
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a method to consecutively perform an installation of a mouth pipe and driving of a steel pipe pile.;SOLUTION: A rotary press-in method of a steel pipe pile comprises: a first process (P1) to engage a half-split excavation jig, which have a first and a second half cylindrical member each provided with spiral blade members, to the steel pipe pile attached to a pile driver; a second process (P2) to attach the steel pipe pile engaged with the half-split excavation jig to a mouth pipe; a third process (P3) to rotary press-in the mouth pipe in synchronization with rotation of the steel pipe pile engaged with the half-split excavation jig; a fourth process (P4) to excavate soil in the mouth pipe with the steel pipe pile engaged with a half-split excavation jig; a fifth process (P5) to rake out soil deposited between the spiral blade members after lifting up the steel pipe pile engaged with the half-split excavation jig; and a sixth process (P6) to rotary press-in the steel pipe pile in a place where the mouth pipe is pressed-in after the half-split excavation jig is removed from the steel pipe pile.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2019,JPO&INPIT
展开▼