A method of erection of a bridge girder of a concrete bridge with a rigid frame structure and a temporary closure structure that can be used for that method.
A method of erection of a bridge girder of a concrete bridge with a rigid frame structure and a temporary closure structure that can be used for that method.
展开▼
机译:一种竖立利用刚性框架结构的混凝土桥梁桥梁的桥梁和可用于该方法的临时闭合结构。
展开▼
页面导航
摘要
著录项
相似文献
摘要
To provide a method that can use constructed parts of a bridge girder as construction road when the concrete bridge girder with frame structure is constructed with cantilever overhang erection method.SOLUTION: A first lateral span part (8b) which is constructed earlier than a central span part (8a) located in the center of a frame structure part makes a connection of central span parts a horizontally force applicable temporary closure from after becoming a pin connection. After central closure is performed by rigid connection on the central span part, a second lateral span part (8c) which is constructed even later than that is center-closed, meanwhile, the first lateral span part is center-closed.SELECTED DRAWING: Figure 1
展开▼