首页> 外国专利> Seawall and seawall construction method

Seawall and seawall construction method

机译:海堤和海堤施工方法

摘要

PROBLEM TO BE SOLVED: To improve installation efficiency of a tide embankment panel to a foundation of a tide embankment and shorten the construction period.SOLUTION: The present invention comprises a foundation 2, a plurality of concrete blocks 10 fixed on the foundation 2 and arranged so that end faces in the width direction are in contact with each other, and a plurality of tide embankment panels 20 fixed on the concrete blocks 10 and arranged so that end faces in the width direction thereof are in contact with each other. A tide embankment 1 is configured such that the tide embankment panel 20 is disposed so as to straddle both concrete blocks 10 at places where the concrete blocks 10 are in contact with each other.SELECTED DRAWING: Figure 1
机译:要解决的问题:提高潮汐堤防面板的安装效率,以潮汐路堤的基础,缩短施工时期。展开:本发明包括基础2,多个混凝土块10固定在基础2上并布置 因此,宽度方向上的端面彼此接触,并且多个潮汐堤防面板20固定在混凝土块10上并且布置成使得其宽度方向上的端面彼此接触。 潮汐堤1构造成使得潮汐堤防面板20设置成在混凝土块10彼此接触的地方横跨混凝土块10。选择图:图1

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号