首页> 外国专利> Construction method of curing formwork structure and tunnel lining body

Construction method of curing formwork structure and tunnel lining body

机译:固化模板结构与隧道衬砌体的施工方法

摘要

To propose a curing formwork structure and a construction method of tunnel lining which can start concrete placing work in other construction areas without waiting for the passage of curing period by a permeable formwork.SOLUTION: A curing formwork structure 7 comprises: a permeable formwork 3 added to a surface of concrete C; a formwork support material 8 for fixing the permeable formwork 3; and curing water supply means 9 for supplying curing water to the permeable formwork 3. The formwork support material 8 exerts a reaction force on the curing water supply means 9 and presses the permeable formwork 3 against the surface of the concrete C.SELECTED DRAWING: Figure 4
机译:为了提出一种固化模板结构和隧道衬里的施工方法,可以在不等待固化期通过可渗透的形式的情况下开始混凝土放置工作。凝结:固化模板结构7包括:添加可渗透的模板3 到混凝土的表面; 用于固定可渗透模板3的模板支撑材料8; 用于将固化水供应到可渗透的模板3的固化供水装置9.模板支撑材料8在固化供水装置9上施加反作用力,并将可渗透的模板3压在混凝土C的表面上。选择的绘图:图 4.

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号