首页> 外国专利> Building automation system with hybrid disaster recovery

Building automation system with hybrid disaster recovery

机译:具有混合灾难恢复的自动化系统

摘要

A method for managing failures in multiple nodes of a building management system includes selecting a second building management system node from the building management system nodes to perform a computing job to determine one or more values for the building management system. The method includes sending the computing job to the second building management system node for the second building management system node to determine the one or more values for the building management system, receiving progress messages from the second building management system node, wherein the progress messages indicate the status of the second building management system node for determining the one or more values, and selecting a third building management system node from the plurality of building management system nodes to perform the computing job in response to the progress messages indicating that the second node has failed to determine the one or more values.
机译:一种用于管理建筑物管理系统的多个节点中的故障的方法包括从建筑物管理系统节点中选择第二构建管理系统节点以执行计算作业以确定构建管理系统的一个或多个值。该方法包括向第二构建管理系统节点发送计算作业,用于第二构建管理系统节点,以确定构建管理系统的一个或多个值,从第二构建管理系统节点接收进度消息,其中进度消息指示用于确定一个或多个值的第二构建管理系统节点的状态,以及从多个构建管理系统节点选择第三构建管理系统节点以响应于指示第二节点具有的进度消息来执行计算作业无法确定一个或多个值。

著录项

  • 公开/公告号US11041653B2

    专利类型

  • 公开/公告日2021-06-22

    原文格式PDF

  • 申请/专利权人 JOHNSON CONTROLS TECHNOLOGY COMPANY;

    申请/专利号US201815896465

  • 发明设计人 ANDREW J. PRZYBYLSKI;

    申请日2018-02-14

  • 分类号F24F11;F24F11/52;F24F11/32;F24F11/88;H04L12/28;G06F8/41;G05B15/02;G06F9/50;F24F11/47;G06F8/34;G06F9/455;G06F8/60;G06F8/35;G06F8/20;H04L29/06;H04L29/08;G06F3/0481;G06F3/0484;G06F9/28;G06F9/451;G05B19/042;G05B19/418;G06F9/448;H04L12/24;G06F9/46;

  • 国家 US

  • 入库时间 2022-08-24 19:28:52

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号