首页> 外国专利> SOLID-STATE TEST PLATFORM AND METHOD ORIENTED TO FUNCTION TEST FOR SMART PHASE-CHANGE SWITCH

SOLID-STATE TEST PLATFORM AND METHOD ORIENTED TO FUNCTION TEST FOR SMART PHASE-CHANGE SWITCH

机译:固态测试平台和智能相变开关功能测试的方法

摘要

A solid-state test platform and method oriented to a function test for a smart phase-change switch (5). The test platform comprises a main controller (1), a first module (2), a second module (3), a capacitor C (4), a smart phase-change switch (5) and a transformer (6), wherein the main controller (1) is respectively connected to the first module (2) and the second module (3), and the main controller (1) is configured to be used for controlling the operation of the first module (2) and the second module (3); the first module (2), the second module (3) and the capacitor C (4) are connected in parallel; the first module (2) is configured to feed back excess energy on the capacitor C (4) to a power distribution network; the second module (3) is configured to control the magnitude and direction of a current flowing through the smart phase-change switch (5); and the capacitor C (4) is configured for energy support, filtering and smoothing. By means of the test platform and method, all unbalanced operation conditions can be simulated, and a simulated unbalanced power is evenly fed back to a power distribution network by means of the test platform, such that a test in a power-consumption-free state is realized, and the power distribution network is also not affected.
机译:固态测试平台和定向到智能相变开关(5)的功能测试的方法。测试平台包括主控制器(1),第一模块(2),第二模块(3),电容器C(4),智能相变开关(5)和变压器(6),其中主控制器(1)分别连接到第一模块(2)和第二模块(3),并且主控制器(1)被配置为用于控制第一模块(2)和第二模块的操作(3);第一模块(2),第二模块(3)和电容器C(4)并联连接;第一模块(2)被配置为将电容器C(4)上的过量能量馈送到配电网络;第二模块(3)被配置为控制流过智能相变开关(5)的电流的大小和方向;并且电容器C(4)配置用于能量支持,过滤和平滑。通过测试平台和方法,可以模拟所有不平衡操作条件,并且模拟的不平衡功率通过测试平台均匀地反馈给配电网络,使得在无功的状态下测试实现,配电网络也没有受到影响。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号