首页> 外国专利> A METHOD FOR PLANNING REPOWERING OF A WIND ENERGY PLANT

A METHOD FOR PLANNING REPOWERING OF A WIND ENERGY PLANT

机译:一种规划风能植物重新交锋的方法

摘要

A method for planning repowering of a wind energy plant (4) is disclosed. The wind energy plant (4) is positioned at a site and comprises a plurality of original wind turbines (5) arranged at distributed positions within the site. Historical data related to the original wind turbines (5) is retrieved. The historical data is collected over a previous time period and during operation of the original wind turbines (5). Meteorological conditions (2) at the site of the wind energy plant (4) are estimated based on the retrieved historical data. The repowering of the wind energy plant (4) is planned based on the estimated meteorological data (2), including planning replacement of the original wind turbines (5) by replacement wind turbines to be positioned at the positions of the original wind turbines (5).
机译:公开了一种规划风能厂(4)的重新排斥力的方法。风能厂(4)位于部位,并且包括布置在部位内的分布位置的多个原始风力涡轮机(5)。检索与原始风力涡轮机(5)相关的历史数据。在先前的时间段内和原始风力涡轮机(5)的操作期间收集历史数据。基于检索到的历史数据估计风能厂(4)位的气象条件(2)。根据估计的气象数据(2)计划风能厂(4)的重新排列,包括通过更换风力涡轮机定位在原始风力涡轮机的位置(5 )。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号