Problem to be solved: to provide a typhoon countermeasure building capable of preventing a roof from being blown off, flooding, collapse of buildings, etc., on a typhoon and an earthquake preventive building of houses such as houses.Solution: as a typhoon countermeasure building, the roof of the building is blown away from the roof of the building, such as flooding, collapsing, building, etc., and sprayed on the top of the roof, the iron plate or the net, etc., is provided, and the water tank is installed at the top, and the rain water tank, the water immersion prevention bag, etc. are provided on the lower side of the rain Provide a typhoon countermeasure building, which can expect seismic response and flood control.Diagram
展开▼