Problem to be solved: to provide a method of handling a floor plate which is separated from a digit so as to shorten the passage stop period of the road in the floor plate renewal work.The method of handling the floor plate 3 separated from the digit 2 is a floor plate separating step which is provided on the girder 2 and separated from the girder 2 which is joined to the girder 2 and separated from the girder 2. This embodiment is characterized in that a floor plate fixing step for fixing the floor plate 3 separated from the digit 2 with the fixing means 4A on the girder 2 is provided.Diagram
展开▼