PROBLEM TO BE SOLVED: To enable one single operation to identify which task of which project resources should be allocated to when multiple projects are executed concurrently with a problem existing in one or more tasks of each of the projects.;SOLUTION: In a project management supporting apparatus 100, an operation processing unit 110 receives a user operation 111 through an input screen. An extraction processing unit 120 selects at least one project among the plurality of projects in response to the one operation 111 received by the operation processing unit 110. The extraction processing unit 120 extracts a task that resources are allocated to among the plurality of tasks included in the selected project. Then, the extraction processing unit 120 generates information 121 indicating the extracted task. A display processing unit 130 displays the information 121 generated by the extraction processing unit 120 in response to the one operation 111.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2018,JPO&INPIT