首页> 外国专利> Computer Implemented Process Control Using Cycle Objects in a Computer Instantiated Mathematical Model Defining Sequence-based Anchoring and Time-based Anchoring Between Nodes

Computer Implemented Process Control Using Cycle Objects in a Computer Instantiated Mathematical Model Defining Sequence-based Anchoring and Time-based Anchoring Between Nodes

机译:计算机实现了使用循环对象在计算机实例化的数学模型中定义了基于序列的锚定和基于时间的节点锚定的过程控制

摘要

A computer method of managing a workflow of scheduled nodes. The method comprises instantiating a computer instantiated mathematical model of workflow paths, wherein the mathematical model defines nodes to be scheduled, defines time-based anchors between the nodes, and sequence-based anchors between the nodes; for each workflow object, determining a workflow schedule for the workflow object by an application executing on a computer system, wherein the workflow schedule comprises a plurality of nodes and wherein the application determines the workflow schedule based on the time-based anchors and sequence-based anchors between nodes defined by the mathematical model; storing by the application context information about completion of the activities performed when performing the node associated with the workflow path of the workflow object; and changing the workflow schedule of the workflow object based on the context information about completion of the activities performed and based on the mathematical model.
机译:一种管理计划节点工作流程的计算机方法。该方法包括实例化工作流路径的计算机实例化数学模型,其中数学模型定义要调度的节点,定义节点之间的基于时间的锚点,并且节点之间的序列锚定;对于每个工作流对象,通过在计算机系统上执行的应用程序确定工作流对象的工作流程计划,其中工作流程调度包括多个节点,并且其中应用基于基于时间的锚和基于序列来确定工作流程调度由数学模型定义的节点之间的锚;通过应用程序上下文信息存储关于在执行与工作流对象的工作流路径关联的节点时执行的活动的完成的信息;基于关于完成活动的上下文信息,改变工作流对象的工作流程计划,并基于数学模型。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号