首页> 外国专利> Resource allocation for tasks of unknown complexity

Resource allocation for tasks of unknown complexity

机译:用于未知复杂性任务的资源分配

摘要

For a task that has been partially executed, a residual complexity index is computed, the task being of a complexity that cannot be ascertained prior to executing the task. An evaluation is made whether the residual complexity index exceeds a cost of a resource that should be considered for allocation to the task. When the evaluation is affirmative, a priority of the task is established relative to a second task. The resource is scheduled to perform the task according to a timing, the timing being determined using the cost of the resource. The resource is allocated to the task according to the timing.
机译:对于已被部分执行的任务,计算剩余复杂性索引,任务是在执行任务之前无法确定的复杂性。评估是否剩余复杂性指数是否超过应考虑分配对任务的资源的成本。当评估是肯定的时,任务的优先级相对于第二个任务建立。该资源被调度根据定时执行任务,使用资源的成本确定的定时。根据定时,资源分配给任务。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号