首页> 外国专利> CONSTRUCTION MANAGEMENT SYSTEM AND METHOD BASED ON BIM

CONSTRUCTION MANAGEMENT SYSTEM AND METHOD BASED ON BIM

机译:基于BIM的施工管理系统和方法

摘要

According to the present invention, a BIM module for generating a BIM model of a building subject to construction work management; A management platform to which the BIM model is uploaded; A mapping module for mapping absence state information to each of the objects in the BIM model uploaded to the management platform; And a design change module that reflects design changes of the construction management target building to the management platform, wherein the mapping module identifies GUIDs assigned to each of the objects of the BIM model uploaded to the management platform. A GUID identification unit and an automatic mapping unit for automatically mapping member status information to the object of the BIM model, and the GUID identification unit includes GUIDs of each of the objects of the modified BIM model reflecting the design change by the design change module BIM-based construction work, which compares the GUIDs of each of the objects of the BIM model before modification and classifies the object with the same GUID as an existing member, and the automatic mapping unit automatically maps the member status information to the object classified as the existing member. A management system is provided.
机译:根据本发明,BIM模块用于产生经过施工工作管理的建筑物的BIM模型;上传BIM模型的管理平台;用于将缺少状态信息映射到上传到管理平台的BIM模型中的每个对象的映射模块;和一个设计变更模块,反映了对管理平台的施工管理目标建设的设计变更,其中映射模块识别分配给上载到管理平台的BIM模型的每个对象的GUID。 GUID识别单元和用于自动将成员状态信息自动映射到BIM模型的对象的自动映射单元,并且GUID识别单元包括修改BIM模型的每个对象的GUID,反映了设计变更模块BIM的设计变化基于施工工作,它将BIM模型的每个对象的GUID进行了复制,并将对象与作为现有成员相同的对象进行分类,自动映射单元自动将成员状态信息映射到分类的对象现有成员。提供管理系统。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号