首页> 外国专利> Culvert construction method

Culvert construction method

机译:涵洞施工方法

摘要

PROBLEM TO BE SOLVED: To provide a method of constructing a culvert which can shorten the construction term without raising the construction cost sharply.SOLUTION: A method of constructing a culvert comprises: a first step of constructing an inverted arch 1, and then erecting a plurality of supports 2 spaced apart in predetermined intervals across the extended direction of the constructed inverted arch 1; a second step of forming reinforced sections of post-arrangement of reinforcement steel bar by arranging the reinforcement steel bars 3a,3b for the culvert so as to be supported by the plurality of supports 2; and a third step of locating an arced center ST1 provided with a lower mold frame K1 throughout a partial one of reinforced sections of post-arrangement of reinforcement steel bars, constructing the culvert at the partial section by injecting concrete on the lower mold frame K1, installing an arched center ST1 in another partial section of reinforced sections of post-arrangement of reinforcement steel bars, and constructing the culvert at another partial section.SELECTED DRAWING: Figure 4
机译:要解决的问题:提供一种构建涵洞的方法,该方法可以缩短施工期限而不提高施工成本。落实:构造涵洞的方法包括:构造倒拱1的第一步骤,然后竖立一个多个支撑件2以预定间隔间隔开的横跨构造的倒拱1的伸展方向;通过将加强钢筋3a,3b布置为涵洞,通过将增强钢筋3a,3b布置成用于涵洞的第二步骤,以便由多个支撑件2支撑;定位有较低模具框架K1的ARCED中心ST1的第三步骤在加强钢筋后排列的增强部分中的一部分中,通过注入下模框架K1上的混凝土构造局部部分的秘涵,在加固钢筋后排列后的增强部分的另一种部分部分安装拱形中心ST1,并在另一种部分部分构建涵洞。选择图:图4

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号