the use of a sealing system approved under water law in a reception room (10) of a facility for the storage, filling and handling of water-hazardous substances, characterized by the fact that individual sections of the sealing system (12) are directly mounted on an existing surface (10-1, 10-2) of the reception area (10), where for the fixing of the sealing system rails on the ground side (12),the ground surface (10-1, 10-2) of the catchment area (10) is equipped with a stripe-shaped substructure (14) on which the tracks of the sealing system (12) are fixed.
展开▼