首页> 外国专利> Method for Cutting Off a Large Waterflow by Means of Cement-grouting while Sinking a Mine Shaft.

Method for Cutting Off a Large Waterflow by Means of Cement-grouting while Sinking a Mine Shaft.

机译:在下沉矿井时通过水泥灌浆切断大水流的方法。

摘要

21,790. Gevers, J. Oct. 3. Excavating; hardening ground.-Relates to the cutting off of water-flow met with while sinking a shaft. The portion of the shaft passing through the water-bearing seams is lined with a tubbing 2. A ballast skeleton bed 1 is then spread over the bottom of the shaft. In the case of a large water-flow, a floor 4 is substituted for the ballast bed. On the ballast or floor a concrete plug is then formed, a pipe 7 passing to the bottom of the shaft containing a suction pipe for keeping the water-level below the concrete plug while this is setting. When the plug has set, the suction pipe is removed and the pipe 7 closed by a cover 8 provided with a valve which is left open until the cover is secured. Cement grout may then be forced through pipes or bore-holes to stop the water-bearing cracks so that excavation may be resumed.
机译:21,790。 Gevers,J.,10月3日。 -与下沉轴时遇到的水流的切断有关。穿过含水接缝的竖井部分衬有管道2。然后将压载骨架床1铺在竖井底部。在水流量大的情况下,地板4代替了压载床。然后在压载物或地板上形成混凝土塞,管道7通向竖井的底部,该管道包含用于将水位保持在混凝土塞下方的抽吸管。塞子固定好后,取下吸水管,并用带阀门的盖8封闭吸管7,该阀保持打开状态,直到盖固定好为止。然后,可以将水泥浆压过管道或钻孔,以阻止含水裂缝,从而可以恢复开挖。

著录项

  • 公开/公告号GB191121790A

    专利类型

  • 公开/公告日1912-02-22

    原文格式PDF

  • 申请/专利权人 JACQUES GEVERS;

    申请/专利号GBD191121790

  • 发明设计人 JACQUES GEVERS;

    申请日1911-10-03

  • 分类号E21D5/012;

  • 国家 GB

  • 入库时间 2022-08-24 14:48:19