Improvements in checkerbrick assemblies for furnace regenerators
Improvements in checkerbrick assemblies for furnace regenerators
展开▼
机译:炉蓄热室格子砖组件的改进
展开▼
页面导航
摘要
著录项
相似文献
摘要
479,125. Regenerators. OPEN HEARTH COMBUSTION CO. June 29, 1936, Neo. 17985. Convention date, March 2. [Class 51 (i)] The upper part of the checker brickwork assembly for a furnace regenerator is constructed of bricks in the form of right parallelopipeds some being of standard size 9" x 4¢" x 2¢" and others 10“" x 4¢" x 2¢". The checker brickwork is arranged with the bricks in adjacent courses disposed crosswise to provide vertical and transverse passages for air and gases as shown. Course C is formed of standard bricks 26. Courses B which alternate with courses A and are arranged longitudinally of the regenerator are formed of standard bricks 26 except adjacent to the walls where long bricks 27 are employed, while courses A are formed of rows of standard bricks 26 and, to provide wells 25 in the checkerwork, rows of long bricks 27, some of which are spaced apart. Interlocking bricks 23 of the form shown in Fig. 12 are used to form an upper course. The lower part of the regenerator is also formed of bricks 23.
展开▼
机译:479,125。再生器。 OPEN HEARTH COBUSTION CO。1936年6月29日,新。 17985.大会日期,3月2日。[Class 51(i)]炉蓄热室检查砖组件的上部由右平行六面体形式的砖建造,某些标准尺寸为9“ x 4¢” x 2 ¢“和其他10”“ x 4¢” x 2¢“。如图所示,方格砖布置成在相邻路线中的砖交叉布置,以提供用于空气和气体的垂直和横向通道。路线C由标准砖26形成。与路线A交替且在蓄热器的纵向布置的路线B由标准砖26形成,除了与使用长砖27的壁相邻,而路线A由标准行形成砖26,以及为了在棋盘格中提供孔25,是一排排长砖27,其中一些隔开。图12所示形式的互锁砖块23用于形成上部层。蓄热室的下部也由砖块23形成。
展开▼