首页> 外国专利> Improvements in or relating to steam power installations including forced-flow, once-through, boilers

Improvements in or relating to steam power installations including forced-flow, once-through, boilers

机译:蒸汽动力装置或与之相关的改进,包括强制流式,直流式锅炉

摘要

896,502. Controlling forced-flow steam boilers. SIEMENS-SCHUCKERTWERKE A.G. July 31, 1958 [July 31, 1957(2); Nov. 16, 1957], No. 24776/58. Class 123(2) In a forced-flow, once-through steam generator comprising a feedwater pump 2 supplying water through an external high pressure preheater 3 to a preheater 4 whence it flows through and is evaporated in tube sections 6, 7, the steam being superheated in sections 8, 9, 10 and passing through a stop valve 12 to a turbine 11, the rate of flow of feed supply is controlled to correspond with the rate of steam output whilst the rate of firing of the boiler is separately controlled according to other variables such as steam pressure at the boiler outlet or at a point between the superheaters. As shown in Fig. 1, flow-measuring constrictions M 1 , M 4 are situated at points 27, 28 and give rise to signals M 1 1, M 4 1 which are compared in a device 30. The output signal from this device, corrected by temperature-dependent signals taken from points 32, 33, which signals are increased as the flow measured at point 34 and represented by a signal M 2 1 increases and vice versa, is passed to the feed pump 2 through a line 31, the signal being effective to increase or decrease the pump speed to bring the signals M 1 , M 4 into correspondence. Steam temperature is maintained constant by automatic interstage water injection at points 36, 37 in dependence on temperature indications at points T 4 , T 5 , T 6 . The furnace chamber shown at 16 receives fuel from a distributer 15 and air from a compressor 18 and discharges gases along a path 19 terminating in an induced draught fan 20. The firing rate is controlled according to signals L 1 , L 2 representative of turbine speed and steam pressure respectively measured at the speed control device 23 of the turbine and at a point 26 at the outlet of the final superheater 10. The distributer 15 is additionally controlled according to the oxygen content of the gases entering the fan 20. In a modification, the steam pressure is measured between the superheaters 9, 10 or 8, 9. In a further modification, the interstage water injection is controlled by superheater temperature and by the throughflow of steam or the rate of flow of feedwater to the preheater 4.
机译:896,502。控制强制流蒸汽锅炉。 SIEMENS-SCHUCKERTWERKE A.G.,1958年7月31日[1957年7月31日(2); [1957年11月16日],第24776/58号。等级123(2)在强制流动的直通式蒸汽发生器中,该蒸汽发生器包括给水泵2,该给水泵通过外部高压预热器3向预热器4供应水,水从中流过并在管段6、7中蒸发,蒸汽在部分8、9、10中过热并通过截止阀12到达涡轮机11时,进料流率被控制为与蒸汽输出率相对应,而锅炉的燃烧率则根据其他变量,例如锅炉出口处或过热器之间的蒸汽压力。如图1所示,流量测量收缩M 1,M 4位于点27、28处,并产生信号M 1 1,M 4 1,这些信号在设备30中进行比较。通过从点32、33提取的随温度变化的信号进行校正,该信号随在点34处测得的流量增加而增大,并由信号M 2 1表示,反之亦然,该信号通过管线31传递到进料泵2信号有效地增加或减小泵速以使信号M 1,M 4相对应。根据点T 4,T 5,T 6的温度指示,通过在点36、37进行自动级间注水,使蒸汽温度保持恒定。标号为16的炉腔接收来自分配器15的燃料和来自压缩机18的空气,并沿终止于引风机20的路径19排出气体。燃烧速度根据代表涡轮速度的信号L 1,L 2进行控制。蒸汽压力和蒸汽压力分别在涡轮机的速度控制装置23和最终过热器10的出口处的点26处测量。分配器15还根据进入风扇20的气体中的氧气含量进行控制。在过热器9、10或8、9之间测量蒸汽压力。在另一种变型中,级间注水由过热器温度和蒸汽的通量或给水到预热器4的流量控制。

著录项

  • 公开/公告号GB896502A

    专利类型

  • 公开/公告日1962-05-16

    原文格式PDF

  • 申请/专利权人 SIEMENS-SCHUCKERTWERKE AKTIENGESELLSCHAFT;

    申请/专利号GB19580024776

  • 发明设计人

    申请日1958-07-31

  • 分类号F22B35/10;F22G5/02;

  • 国家 GB

  • 入库时间 2022-08-23 17:38:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号