首页> 外国专利> Means for erecting mine roadway supports, especially circular supports

Means for erecting mine roadway supports, especially circular supports

机译:架设矿井巷道支架的方法,特别是圆形支架

摘要

909,226. Boreholes. EGGEMANN, W., and CAMPENHAUSEN, E. VON, [trading as SCHWARZ KOMM.-GES., HERMANN]. Feb. 22, 1960 [Feb. 21, 1959; May 11, 1959; May 23, 1959], No. 6082/60. Class 85. An excavating machine 10 having rubble removing conveyers 12, 14, is provided with a carrier 16 for segmental wall supports together with a rotary ring 19 for assembling the supports, said member 19 sliding on rollers 20 carried by the member 16 and being driven by a motor 24 through a pinion 23. The segments are held on the ring 19 by adjustable stops 26 and claws 27, see also Figs. 11, 12 and 13 (not shown), and are interconnected in known manner to form a support ring which is positioned adjacent the completed reinforced section of the tunnel by cylinders 35, the claws 27 moving radially outwards to urge the ring into contact with the tunnel wall. The erecting apparatus 16, 19 is connected to the excavating unit by at least one fluid-operated jack 38 which is adapted to function when grippers 17 on the unit 16 are retracted. The excavating unit may be used in conjunction with two erecting-machines, see Figs. 5, 6 and 7 (not shown). The carrier 16 may be constructed from sections each consisting of inner and outer curved plates interconnected by I-section steel bars, the sections being bolted together and to a wedge-shaped top portion, see Figs. 15, 16 and 17 (not shown). In a further modification, Figs. 18 and 19 (not shown), the segmental supports are urged radially outwards by push-rods constructed as racks and drivingly interconnected by universal couplings.
机译:909,226。钻孔。 EGGEMANN,W。和CAMPENHAUSEN,E。VON,[交易为SCHWARZ KOMM.-GES。,HERMANN]。 1960年2月22日[2月2日1959年21日; 1959年5月11日; [1959年5月23日],编号6082/60。等级85。具有碎石去除输送机12、14的挖掘机10设置有用于分段壁支撑件的托架16以及用于组装支撑件的旋转环19,所述构件19在由构件16支撑的辊20上滑动,并且马达24通过小齿轮23驱动。各段通过可调节的挡块26和爪27保持在环19上,也参见图1和2。如图11、12和13(未示出)所示,并以已知的方式相互连接以形成支撑环,该支撑环通过圆柱体35定位在隧道的已完成的加固部分附近,爪27径向向外移动以促使环与圆柱体接触。隧道墙。竖立设备16、19通过至少一个流体操作千斤顶38连接到挖掘单元,该流体千斤顶38适于在单元16上的夹持器17缩回时起作用。挖掘单元可以与两台架设机结合使用,请参见图1和2。 5、6和7(未显示)。托架16可以由各部分构成,各部分包括由I形截面的钢条相互连接的内部和外部弯曲板,这些部分用螺栓固定在一起并连接到楔形顶部,见图2和3。 15、16和17(未显示)。在进一步的修改中,图1至图4示出了图3的示例。如图18和19(未示出)所示,分段支撑件被构造成齿条的推杆径向向外推动,并通过通用联轴器驱动地互连。

著录项

  • 公开/公告号GB909226A

    专利类型

  • 公开/公告日1962-10-31

    原文格式PDF

  • 申请/专利权人 WILLY EGGEMANN;EBERHARD VON CAMPENHAUSEN;

    申请/专利号GB19600006082

  • 发明设计人

    申请日1960-02-22

  • 分类号E21D11/40;

  • 国家 GB

  • 入库时间 2022-08-23 17:36:25

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号