首页> 外国专利> Improvements in the construction of hot water boilers for forced circulation heating facilities. (Machine-translation by Google Translate, not legally binding)

Improvements in the construction of hot water boilers for forced circulation heating facilities. (Machine-translation by Google Translate, not legally binding)

机译:改进用于强制循环供暖设施的热水锅炉的结构。 (通过Google翻译进行机器翻译,没有法律约束力)

摘要

Improvements in the construction of hot water boilers for forced circulation heating systems, in which the circulation pump transports water through tubes of the contact heating surface, while in the radiating heating surface, formed by at least for side wall and rear wall pipes, the water rises due to the lifting force in the pipes, characterized in that the heated pipes of the side walls or of the rear wall are curved for the roof covering and the wall pipes lateral and rear wall drain into collectors located perpendicularly to each other, extracting from one of these collectors the pre-phase water for heating installation. (Machine-translation by Google Translate, not legally binding)
机译:改进了用于强制循环加热系统的热水锅炉的结构,其中循环泵通过接触加热表面的管子输送水,而在辐射加热表面(至少由侧壁和后壁管组成)形成辐射的加热表面由于在管道中的提升力而上升,其特征在于,侧壁或后壁的加热管为屋顶覆盖物弯曲,并且壁管的横向和后壁排入彼此垂直的集热器,从这些收集器之一用于加热装置的预相水。 (通过Google翻译进行机器翻译,没有法律约束力)

著录项

  • 公开/公告号ES318794A3

    专利类型

  • 公开/公告日1966-01-01

    原文格式PDF

  • 申请/专利权人 VORKAUF HEINRICH;

    申请/专利号ES19650318794

  • 发明设计人

    申请日1965-10-22

  • 分类号1F22BA;

  • 国家 ES

  • 入库时间 2022-08-23 15:15:19

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号