首页> 外国专利> Before the direction for maneuvering untertaegigen located in the mining umschlagund shifting points, in particular for monorail - haengebahnen

Before the direction for maneuvering untertaegigen located in the mining umschlagund shifting points, in particular for monorail - haengebahnen

机译:在位于乌斯拉格蒙德(Uschlagund)采矿点上的不确定性机动方向之前,特别是对于单轨列车-Haengebahnen

摘要

The shunting device has a shunting wagon (4) with its own drive (7) suspended from an independent shunt track and supplied from an energy line (12) alongside the latter. The shunting wagon (4) can be selectively coupled with the transport wagons of the overhead railway via a pivoted coupling bar (5). - The energy line (12) for the shunting wagon (4) is connected to a line (11) suspended from the shunting rail at spaced points to form a series of loops, which take up the slack when the shunting wagon (4) is moved backwards. The drive motor operates in conjunction with a winch wheel wound around with a loop of a winch cable attached to two spaced fixed points at its ends.
机译:该分流装置具有一个分流货车(4),其自身的驱动器(7)悬挂在一个独立的分流轨道上,并由能量线(12)与后者并联。分流货车(4)可以通过枢转的连接杆(5)与高架铁路的运输货车选择性地连接。 -调车(4)的能量线(12)连接到在一定距离上悬挂在调车轨道上的线(11)上,形成一系列环路,当调车(4)处于向后移动。驱动马达与绞盘一起运行,绞盘绕在绞盘上,绞盘电缆的一端连接在两个固定的固定点上。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号