首页> 外国专利> Increasing permeability of sinter-plant beds - by piercing the fine ore etc. bed of charge material with bolt headed spikes

Increasing permeability of sinter-plant beds - by piercing the fine ore etc. bed of charge material with bolt headed spikes

机译:烧结厂床层的渗透性增加-通过用螺栓头的尖刺刺穿装料的细矿等床层

摘要

The bed pref. of iron ore, is pierced across its width, by bolt-headed spikes protruding through the underside of a frame sliding rapidly upwards and downwards within a fixed chassis positioned above the sinter-plant strand, ahead of the burner. The rapid motion of the frame relative to the speed of the strand gives piercing intervals of 30-60 mm for a strand speed of approx. 3000 mm/min. The high rate of movement is pref. effected by a cam arrangement.
机译:床偏好。通过在炉膛前方位于燃烧器前面的固定机架内的机架底侧突出的螺栓头尖钉,铁矿石在整个宽度上被刺穿。框架相对于钢绞线速度的快速运动为大约30毫米的钢绞线速度提供了30-60毫米的穿刺间隔。 3000毫米/分钟高运动速度是首选。通过凸轮装置实现。

著录项

  • 公开/公告号BE812222A

    专利类型

  • 公开/公告日1974-09-12

    原文格式PDF

  • 申请/专利权人

    申请/专利号BE19746044496

  • 发明设计人

    申请日1974-03-12

  • 分类号C21B;

  • 国家 BE

  • 入库时间 2022-08-23 06:15:25

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号