首页> 外国专利> Direction well blasting before hydraulic fracturing - by pressure peak of two explosive shock waves

Direction well blasting before hydraulic fracturing - by pressure peak of two explosive shock waves

机译:水力压裂之前的定向井爆破-由两个爆炸冲击波的压力峰值

摘要

The secondary recovery of petroleum by hydraulic fracturing of wells is much improved by blasting. Pairs of detonators are arranged between packs of explosives in such a way that two simultaneous explosions are triggered in two different planes. Where the shock waves meet, a pressure peak is built up which induces the formation of a fracture in the strata.
机译:爆破大大改善了水力压裂井对石油的二次采收率。成对的雷管被布置在炸药包之间,使得在两个不同的平面上同时引发两次爆炸。在冲击波相遇的地方,会形成压力峰值,从而引起地层中裂缝的形成。

著录项

  • 公开/公告号FR2200433A1

    专利类型

  • 公开/公告日1974-04-19

    原文格式PDF

  • 申请/专利权人 BANYASZATI KUTATO INTEZETBG;

    申请/专利号FR19730033091

  • 发明设计人

    申请日1973-09-14

  • 分类号E21B43/26;

  • 国家 FR

  • 入库时间 2022-08-23 05:13:49

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号