首页> 外国专利> Foundation prepn. for heavy pylon - uses pile driven through prefabricated concrete crown set in earth shaft

Foundation prepn. for heavy pylon - uses pile driven through prefabricated concrete crown set in earth shaft

机译:基金会准备用于重型塔架-使用桩,该桩通过设置在土方井中的预制混凝土胎冠驱动

摘要

Foundation is made with a foundation pile and concrete head for a heavy overhead cable pylon. A prefabricated concrete crown with an outer reinforcement is set in a ground shaft, and the pile is rammed into the interior of the crown and into the earth. An inner reinforcement with projecting pylon connection elements is inserted into the inner region of the crown, which region is then filled with concrete. Handling of shuttering is eliminated. The pile may have a double T profile, and is rammed in until its top end lies below the top end of the crown.
机译:基础由基础桩和混凝土头制成,用于重型架空电缆塔。带有外部钢筋的预制混凝土树冠被设置在地轴中,桩被撞入树冠内部并进入地面。将带有突出的塔式连接元件的内部钢筋插入胎冠的内部区域,然后在该区域中填充混凝土。消除了模板处理。桩可能具有双重T形轮廓,并被夯入直到桩的顶端位于胎冠顶端之下。

著录项

  • 公开/公告号DE2341651A1

    专利类型

  • 公开/公告日1975-02-27

    原文格式PDF

  • 申请/专利权人 REIMANNOTTO;

    申请/专利号DE19732341651

  • 发明设计人 REIMANNOTTO;

    申请日1973-08-17

  • 分类号E02D27/42;

  • 国家 DE

  • 入库时间 2022-08-23 03:58:29

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号