首页> 外国专利> Construction of buildings with different material zones - uses room shuttering with internal shutter walls

Construction of buildings with different material zones - uses room shuttering with internal shutter walls

机译:建造具有不同材料区域的建筑物-使用带有内部百叶窗墙的房间百叶窗

摘要

A room shuttering for the complete building is constructed, with internal shutter walls. The building zones formed in this way are filled with concrete in situ, and similar materials. For the simultaneous construction of walls and ceilings of different materials, the internal shutters enclose the walls and ceiling supports. The walls are filled with insulating construction materials, while the ceiling and ceiling supports are cast from concrete with reinforcement, if necessary. Pref. the filling consists of foamed concrete, foamed gypsum, or foamed polyester material. An insulating panel is inserted in the assembly before the ceiling support components are poured.
机译:建造了用于整个建筑物的百叶窗,并带有内部百叶墙。以这种方式形成的建筑区域就地填充有混凝土和类似的材料。为了同时建造不同材料的墙壁和天花板,内部百叶窗围住了墙壁和天花板支架。墙壁填充了隔热的建筑材料,而天花板和天花板支架则根据需要由混凝土加固而成。首选填充物由泡沫混凝土,泡沫石膏或泡沫聚酯材料组成。在浇注天花板支撑组件之前,将绝缘面板插入组件中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号