首页>
外国专利>
Continuous vertical furnace for metal oxide mfr. - includes pre-drying chamber for raw material before entering furnace as discrete streams
Continuous vertical furnace for metal oxide mfr. - includes pre-drying chamber for raw material before entering furnace as discrete streams
展开▼
机译:连续立式金属氧化物炉mfr。 -包括用于原料的预干燥室,然后以离散流的形式进入熔炉
展开▼
页面导航
摘要
著录项
相似文献
摘要
The raw material enters the pre-drying chamber from a horizontally aligned helically bladed charging scraper through a grate in the roof of the pre-dryer. The discrete streams thus formed fall directly through the furnace which is externally heated in such a way as to produce a temp. gradient within the interior, typically rising to a max of 13 1300 degrees C near the centre and falling to 400 degrees C at the lower exit. Final cooling to aprox. room temp. takes place in a water cooled chamber beneath the furnace before removal on a screw conveyor. Useful for processing high purity Al2O3, MgO, and SiO2 for use in semiconductor mfr quantum electronics and optics technology.
展开▼