首页> 外国专利> Planning chart using horizontal bars - uses coloured bars and lines to represent different tasks and progress

Planning chart using horizontal bars - uses coloured bars and lines to represent different tasks and progress

机译:使用水平条的计划图-使用彩色条和线表示不同的任务和进度

摘要

The programme planning chart enables one to see the progress of works with respect to planned progress, and to determine the effects of differences. Each operation of the works is represented by elementary tasks which are represented on the chart by a series of coloured bars. Each operation of a specific colour is connected by well defined constraints. Date on the charts is represented by vertical lines. Overlaid on these lines are broken lines (9) which indicate the actual progress of the works with respect to the planned progress at a given date. Delays to the left of the line are indicated by red markers (13). Advancements to the right of the line are indicated by green markers (12).
机译:计划计划图使人们能够查看与计划进度相关的工作进度,并确定差异的影响。作品的每项操作均由基本任务表示,这些任务在图表上由一系列彩色条表示。每种特定颜色的操作都通过定义明确的约束条件进行连接。图表上的日期由垂直线表示。在这些线上覆盖着虚线(9),这些虚线表示相对于给定日期的计划进度的工程实际进度。该行左侧的延迟由红色标记(13)指示。该行右侧的进度由绿色标记(12)指示。

著录项

  • 公开/公告号FR2306491A1

    专利类型

  • 公开/公告日1976-10-29

    原文格式PDF

  • 申请/专利权人 BOUSQUET ANDRE;

    申请/专利号FR19750010533

  • 发明设计人

    申请日1975-04-04

  • 分类号G09F7/00;

  • 国家 FR

  • 入库时间 2022-08-23 01:46:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号