首页> 外国专利> PROCEDURE FOR THE CONSTRUCTION OF A BRIDGE OF CONCRETE ARMED WITH A LOADING REINFORCEMENT AND BRIDGE THEREFORE OBTAINED.

PROCEDURE FOR THE CONSTRUCTION OF A BRIDGE OF CONCRETE ARMED WITH A LOADING REINFORCEMENT AND BRIDGE THEREFORE OBTAINED.

机译:带有负载钢筋的混凝土桥梁桥的建造程序,并因此获得桥梁。

摘要

In a method of constructing a reinforced concrete bridge a supporting arch is erected which comprises a cocked center part of which forms a supporting reinforcement intended to be incorporated in the concrete of the final bridge structure. Shuttering is placed in position on the arch and the concrete poured to embody the supporting reinforcement and constitute the deck of the bridge. The resultant deck is formed by a ribbed slab, by girders connected by a slab, or by at least one box. After the concrete has hardened the remaining exterior part of the arch is removed, and if required additional reinforcement may be embodied in the concrete.
机译:在建造钢筋混凝土桥梁的方法中,竖立支撑拱,该支撑拱包括拱起的中央部分,该拱起的中央部分形成支撑加强物,该支撑加强物意图被并入最终桥梁结构的混凝土中。将百叶窗放置在拱门上的适当位置,并浇筑混凝土以体现支撑钢筋并构成桥梁的甲板。所形成的甲板由肋板,由板连接的大梁或至少一个盒子形成。在混凝土硬化之后,去除拱的其余外部,并且如果需要,可以在混凝土中实施额外的加固。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号