首页> 外国专利> Staged multi-span reinforced concrete bridge erection - using supports carried through roadway edge cut=outs and fixed to pier

Staged multi-span reinforced concrete bridge erection - using supports carried through roadway edge cut=outs and fixed to pier

机译:分段多跨钢筋混凝土桥梁的架设-使用通过巷道边缘切去的支撑物固定并固定在桥墩上

摘要

The system for staged erection of multi-span reinforced concrete bridges has two girders (5, 5') of the displacement gear mounted above the outline of two adjacent superstructure components or main girders, with firm cross connections (6) in two parts above the pier. They are spaced to allow the two centre superstructure pieces (7), to be lowered, and fastened to the cross connections with fork units. The supports (11) in the two rows in the pier transverse axis are led through edge cutouts adjoining the contact surfaces of the two centre prefabricated superstructure components, in the carriageway slab. They are fixed to the pier below these, or set on its base.
机译:用于多跨钢筋混凝土桥梁的分阶段安装系统具有两个位移梁(5、5'),该位移梁安装在两个相邻的上层建筑构件或主梁的轮廓上方,在其上方的两个部分中具有牢固的交叉连接(6)。码头。它们之间的间距允许将两个中央上部结构件(7)放下并通过叉形单元固定到交叉连接处。墩横轴上的两排支撑件(11)穿过边缘切口,该切口与车道平板中两个中央预制上部结构部件的接触面邻接。它们固定在这些下方的码头上,或固定在其底部。

著录项

  • 公开/公告号DE2704033A1

    专利类型

  • 公开/公告日1978-08-03

    原文格式PDF

  • 申请/专利权人 BETON- UND MONIERBAU AG;

    申请/专利号DE19772704033

  • 发明设计人 LOHMILLERHERMANNDIPL.-ING.DR.;

    申请日1977-02-01

  • 分类号E01D21/02;

  • 国家 DE

  • 入库时间 2022-08-22 21:58:46

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号