PLATTFORM TIL MONTERING I HAV ELLER ANNEN VANNMASSE, SAMT FREMGANGSMAATE TIL DENS OPPFOERING

机译:海洋或其他水质安装平台以及其建造程序

摘要

1481960 Offshore platforms; structural joints C G DORIS (COMPAGNIE GENERALE POUR LES DEVELOPPEMENTS OPERATIONNELS DES RICHESSES SOUS-MARINES) 5 Nov 1974 [29 Nov 1973] 47730/74 Headings E1H and E1W A concrete jacket is built from two sections which are constructed separately and then mounted one on top of the other and the two sections comprise a bottom part formed by a base 10 with stiffeners 11, peripheral wall 9, tubular members 8 and hollow columns 3 and a top part formed by a deck 7, hollow legs 6, collars 18 and tubular members 17. The columns 3 are attached integrally to the members 8 and are surrounded by wall 9. Columns 3 and the tubular members 8, 17 are internally divided by bulkheads 14, 16, 17a into buoyancy tanks with associated ballast lines 15, 16 and 19. Fabrication. The deck 7, collars 18, tubular members 17 and the lowermost portions of the legs 6 are built in a dry dock with the bridge 7 above the members 17 and resting on, a sliding formwork which is used to cast the legs 6. After flooding the dock, the partially built and buoyant top section is moved to a sheltered location where erection of the legs 6 is completed afloat, the bridge 7 being simultaneously raised as the legs 6 are formed by a hoist mechanism and finally connected to the legs. Whilst the top section is being completed afloat, the bottom section is partially constructed in the dry dock and the columns 3 are completed with the section afloat at another location. The columns 3 are sealed at their upper ends and are each attached to an auxiliary buoyancy chamber. The bottom section is then towed to a location having a flat water bed where it is sunk by flooding the buoyancy tanks in member 8. The auxiliary buoyancy chambers are removed and the top section is positioned above the sunken bottom section so that the collars 18 are connected to columns 3. After joining the top and bottom sections together, the jacket is partially deballasted, towed to its final location and then sunk to the bottom. Connecting the deck 7 to the legs 6 is performed using openings 23 in the deck 7 in to which are positioned sleeves 27a and steel reinforcement 28a which cooperate with sleeves 27 and fixings 28 located in the concrete of the deck 7 and legs 6 at an earlier building stage. After concrete has been poured and set in the openings 23, prestressing cables 30 are assembled in the sleeves 27, 27a whereafter further concrete is poured into these sleeves. The legs 6 are connected to the columns 3 by prestressing cables 45 anchored at points 45a 45b. This work is undertaken using a panel 41 which is used to seal off the open bottom of a leg 6 which has a male projection 37 cooperating with a female recess in the upper end of the columns 3. Inflatable seals 40 prevent ingress of ambient sea water.
机译:1481960离岸平台; 1974年11月5日[1973年11月29日] CG DORIS(法国里约热内卢-德普里维斯发展公司)另一部分和两个部分包括由具有加强件11的基部10,外围壁9,管状构件8和空心柱3形成的底部,以及由甲板7,空心腿6,轴环18和管状构件形成的顶部。 17.立柱3整体地附接到构件8并且被壁9围绕。立柱3和管状构件8、17被舱壁14、16、17a在内部划分为具有相关压载管线15、16和19的浮力罐。制作。甲板7,轴环18,管状构件17和支腿6的最下部被构建在干船坞中,桥架7位于构件17上方并搁置在其上,该滑动模板用于浇铸支腿6。在船坞中,部分建造且浮力的顶部移至遮蔽的位置,在该遮蔽的位置,支腿6的安装完全浮起,当支腿6由提升机构形成并最终连接到支腿时,桥7同时升高。在顶部完成漂浮的同时,底部部分地构造在干船坞中,并且塔3在另一位置漂浮完成。立柱3在其上端被密封并且每个附连到辅助浮力室。然后将底部拖曳到具有平坦水床的位置,在该位置通过充入构件8中的浮力槽将其沉没。移除辅助浮力室,将顶部定位在沉没的底部上方,以使卡圈18连接到立柱3。将顶部和底部连接在一起后,对夹克进行部分压舱,拖至最终位置,然后沉入底部。使用甲板7中的开口23来执行将甲板7连接到支腿6上的开口23,套筒27a和钢筋28a定位在开口23中,所述套筒27a和钢加强件28a与位于先前的甲板7和支腿6的混凝土中的套筒27和固定件28配合建设阶段。在将混凝土倒入并固定在开口23中之后,将预应力电缆30组装在套筒27、27a中,然后将更多的混凝土倒入这些套筒中。支腿6通过锚定在点45a,45b处的预应力电缆45连接到柱3。这项工作是使用一块面板41进行的,该面板用来密封腿6的开口底部,该腿6的一个凸出凸起37与圆柱体3上端的凹入凹陷相配合。可充气的密封件40可以防止周围海水进入。

著录项

获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号