首页> 外国专利> Large scale plant for roasting iron ore pellets - where travelling grate furnace feeds number of shaft furnaces

Large scale plant for roasting iron ore pellets - where travelling grate furnace feeds number of shaft furnaces

机译:大型铁矿石颗粒焙烧厂-移动炉排炉进料竖炉数量

摘要

Bulk material, esp. iron ore pellets are treated by (a) drying; (b) preheating; (c) prebaking; (d) final baking; and (e) cooling. At least steps (a,b) are undertaken on travelling grates in a belt furnace (x); and at least step (d) is carried out in a shaft furnace(y). Furnace (x) is pref. used for steps (a,B,C) and furnace (y) for steps (d,e), esp. where gas flows in counter current to the pellets and part of the gas used in step (a) is fed into step (e) for cooling. The pref. plant consists of a belt furnace contg. travelling grates for steps (a,b,c) and feeding the shaft furnace. Gas is fed in direction (e,d,c,b,a); and one furnace (x) pref. supplies three to six, e.g. five, shaft furnaces arranged in a circular row round the outlet of furnace (x). A flexible plant suitable for baking various types of iron ore pellets, with an extremely high output and reasonable investment- and operating-costs.
机译:散装材料,特别是铁矿石球团通过(a)干燥进行处理; (b)预热; (c)预烤; (d)最后烘烤; (e)冷却。在带式炉(x)中对行进的炉排至少执行步骤(a,b);至少步骤(d)在竖炉(y)中进行。炉(x)是优选的。用于步骤(a,B,C)和炉子(y)用于步骤(d,e),尤其是。其中气体以逆流的形式流向小球,并且步骤(a)中使用的部分气体被送入步骤(e)进行冷却。偏好。该工厂由一台皮带炉(续)组成。移动炉排进行步骤(a,b,c),然后将其送入竖炉。气体沿(e,d,c,b,a)方向进料;一炉(x)偏好。供应三到六,例如五,竖炉在排出口(x)的周围排成一排。灵活的工厂,适合烘烤各种类型的铁矿石球团,产量极高,投资和运营成本合理。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号