Connection for driven piles with welded brackets - has projections at pile joint end diverting loads away from joint to shorten driving time
Connection for driven piles with welded brackets - has projections at pile joint end diverting loads away from joint to shorten driving time
展开▼
机译:带焊接托架的打桩桩的连接-桩接头末端有突出物,可将载荷从接头转移开,以缩短驱动时间
展开▼
页面导航
摘要
著录项
相似文献
摘要
The joint between driven pile ends has welded connection brackets. This arrangement ensures good guiding for the second driven pile which has already been inserted. The whole pile length is available on tension loading. Brackets (9) are welded on flanges (3) or webs (8) of the connected pile ends (6, 7). The brackets are connected by the tension connectors. These connectors hace at both ends (11) a hammer head profile. The brackets (9) prevents tearing of the welded joints when the pile is driven because forces are not directed through welded points. The driving time of the composite pile is appreciably shortened because the major part of the welding is carried out in the works and not on site.
展开▼