首页>
外国专利>
Concrete highway slab crack filling process - involves grinding dovetail section channel on crack line and filling with elastic or plastic strip
Concrete highway slab crack filling process - involves grinding dovetail section channel on crack line and filling with elastic or plastic strip
展开▼
机译:公路混凝土板裂缝填充过程-涉及在裂缝线上研磨燕尾形截面通道并填充弹性或塑料条
展开▼
页面导航
摘要
著录项
相似文献
摘要
The grinding and filling process is for utilization in the filling of cracks in concrete slabs e.g. highway pavements. The process involves grinding a groove in the surface of the concrete and along the line of the crack. The groove has a dovetail cross-section and is then filled with a strip of elastic or plastic material. The section of the groove is designed to avoid deterioration and debonding of the filler under thermal movements etc. The grinding operation may require the making of two oblique incisions on opposite sides of the crack, and the grinder may be inclined at 30 degrees to the vertical.
展开▼