Methods of pipeline construction in arctic and subarctic regions

机译:北极和亚北极地区的管道施工方法

摘要

Methods of pipeline construction in arctic and subarctic regions and apparatus for carrying out those methods are disclosed. Following the disclosed methods, summer-constructed fabrication yards are established at locations along the pipeline right-of-way spaced at intervals of 100 to 150 miles. Each summer-constructed fabrication yard is regarded as being at or close to the center of its associated pipeline division, which is approximately 100 to 150 miles in length. Each fabrication yard comprises a group of summer-constructed buildings adapted for carrying out the steps in fabricating a pipe section, including quality control, X- ray, hydrostatic testing, external coating, final inspection, and river coating and weighting, along with yard facilities for moving elongated (e. g., 2500 foot) pipe sections from place to place during their fabrication, inspection, coating, etc. PP In the winter following the summer in which each pipe section is fabricated it is towed to its place of installation over a working snow pad or snow road following the pipeline right-of-way, for instance, by a pair of large tow tractors operating in tandem and provided with servo-controls by which one tow tractor operator in the front tractor can operate both tractors. The sensors or sensing instruments mounted on or in the pipe section in the fabrication yard during summer are cabled to indicating instruments in the oversized cab of the lead tow tractor, where they can be constantly observed by the controller or crew chief to assure that while in transit the pipe section undergoes no bend less than its permissible roped radius of curvature. The forward end of the pipe section being towed into place is mounted on a nose sled which also bears a compressor and air heater for the purpose of maintaining an elevated temperature inside the hermetically sealed pipe section.PP When a pipe section is being moved from the summer fabrication yard to its winter place of installation over a snow road a number of sideboom tractors (e.g., ten) accompany the pipe section, guiding respective portions of it in special roller cradles which are equipped with pipe-gripping means or brakes remotely controlled by the respective sideboom operators, so that the sideboom tractors can instantly grasp their associated pipe sections to assist in towing or prevent uphill or downhill "runaway".
机译:公开了在北极和亚北极地区中的管道构造方法以及用于执行这些方法的设备。按照所公开的方法,在沿管道通行权的位置处以100至150英里的间隔布置的夏季建造的制造场。每个夏季建造的制造厂都被视为在其相关管道部分的中心或附近,管道的长度大约为100至150英里。每个造船厂包括一组夏季建造的建筑物,这些建筑物适于执行制造管段的步骤,包括质量控制,X射线,静水压测试,外部涂层,最终检查以及河道涂层和称重,以及堆场设施用于在制造,检查,涂覆等过程中将细长的(例如2500英尺)管段从一个地方移到另一个地方。

在每个管段制造之后的冬天,将其拖到其位置安装在沿管线通行权的工作雪垫或雪道上的安装,例如,由一对串联运行的大型牵引车并提供伺服控制,前牵引车中的一个牵引车操作员可通过该控制进行操作两台拖拉机。在夏季,安装在制造场中管道部分上或内部的传感器或感测仪器通过电缆连接到铅丝牵引车超大驾驶室中的指示仪器,控制器或机组负责人可以在此不断观察它们,以确保在过渡时,管段的弯曲不得小于其允许的绳索曲率半径。被拖曳到位的管段的前端安装在一个鼻架上,该鼻架还装有压缩机和空气加热器,目的是保持密封管段内部的高温。

在雪道上从夏季制造场移至冬季安装场所,管道段上伴随着许多侧臂牵引车(例如十台),在装有滚轮固定装置的专用辊架中引导其各个部分或由相应的侧臂操作员远程控制的制动器,以便侧臂拖拉机可以立即抓住其相关的管段,以协助牵引或防止上坡或下坡“失控”。

著录项

  • 公开/公告号US4130925A

    专利类型

  • 公开/公告日1978-12-26

    原文格式PDF

  • 申请/专利权人 GIBSON;MURRAY;

    申请/专利号US19770789744

  • 发明设计人 MURRAY GIBSON;

    申请日1977-04-21

  • 分类号B23Q17/00;

  • 国家 US

  • 入库时间 2022-08-22 19:21:47

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号