Complete cavity filling in prestressed concrete structure - involves introduction of measured volume of gas and removal before measured filler insertion
Complete cavity filling in prestressed concrete structure - involves introduction of measured volume of gas and removal before measured filler insertion
展开▼
机译:在预应力混凝土结构中完全填充型腔-涉及引入一定量的气体并在插入一定量的填充剂之前将其除去
展开▼
页面导航
摘要
著录项
相似文献
摘要
The process is used in bridge construction and elsewhere, for completely filling a hollow space. It is esp. applicable to a partially filled sheathing tube for a stress member in a prestressed concrete structure, with preliminary evacuation. Air is sucked out of the cavity (8) until a predetermined level is attained. Gas is introduced, with and the volume is metered. The volume of the cavity is determined from the amount of gas flowing in. The gas is sucked out down to the level of a slight residual pressure. The filling substance (6) is introduced, and its volume is metered. This makes it possible to ensure that a cavity is completely filled with filler, without drilling into the structure.
展开▼