首页> 外国专利> Dust free hot bituminous compound preparation - involves twin drums with aggregate and binder forming screen in hot gases

Dust free hot bituminous compound preparation - involves twin drums with aggregate and binder forming screen in hot gases

机译:无尘热沥青混合料的制备-包括具有热气中的骨料和粘合剂形成筛网的双桶

摘要

Bituminous compound prodn. by continuous process, with min. dust content, takes place with aggregate (20) and binder (21) entering a top revolving drum (1) and passing as a mixture to a bottom one (2). Heating gas flow from bottom drum to top one is effected via fixed housing components (6) which also form a runout chute for prepared compound (23), and gas deflection to the top drum takes place through the top part. Aggregate via the input chute, and binder constituents, are evenly distributed over the top drum cross-section, forming a veil, and gases led in with them deliver most of their heat content, any dust particles till free, and gaseous binder distillate to the mixture (22). Exhaust gases (27), completely devoid of these impurities, are carried away via the flue.
机译:沥青复合产品通过连续过程,最小含尘量是在骨料(20)和粘合剂(21)进入顶部转鼓(1)并作为混合物到达底部(2)的情况下发生的。从底鼓到顶部鼓的加热气流是通过固定的外壳部件(6)进行的,该外壳部件也形成用于制备的化合物(23)的跳动斜槽,并且气体通过顶部偏转到顶鼓。经由进料斜槽的骨料和粘合剂成分均匀分布在顶部转鼓的整个横截面上,形成面纱,而引入的气体则将绝大部分热量,直至游离的灰尘颗粒以及气态的粘合剂馏出物输送到塔顶。混合物(22)。完全不含这些杂质的废气(27)通过烟道被带走。

著录项

  • 公开/公告号FR2433076A1

    专利类型

  • 公开/公告日1980-03-07

    原文格式PDF

  • 申请/专利权人 MUNTZER EMILE;

    申请/专利号FR19780024079

  • 发明设计人

    申请日1978-08-11

  • 分类号E01C19/10;

  • 国家 FR

  • 入库时间 2022-08-22 17:21:35

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号