首页> 外国专利> MEETING PEAK POWER GENERATION DEMAND BY USING WINKLER COAL GASIFIER AND GAS TURBINES

MEETING PEAK POWER GENERATION DEMAND BY USING WINKLER COAL GASIFIER AND GAS TURBINES

机译:通过使用Winkler煤气化炉和燃气轮机满足高峰发电需求

摘要

Meeting variable demand on power station using gas turbines is ensured by gasification of carbon-bearing material using an oxygen-containing agent. This simplifies the problem of fast response to peak loads and avoids the chemical conversion of the product by applying a fluidised-bed reactor with a working temperature of over 800 deg.C. The reactor can be restarted quickly after being laid off for longer periods of time. The ability of rapid attainment of the working regime in the reactor is due to the holding of the solid fuel storing sufficient heat for reacting. At the same time, it prevents contacting of product gas with the oxygen-containing agent. The reactor permits low-value fuel to be converted and the contaminating sulphur is bonded chemically by feeding limestone.
机译:通过使用含氧剂气化含碳材料,可以确保满足使用燃气轮机发电站的各种需求。通过使用工作温度超过800℃的流化床反应器,这简化了对峰值负载快速响应的问题,并避免了产物的化学转化。停产较长时间后,反应器可以快速重启。在反应器中快速达到工作状态的能力是由于保持固体燃料储存足够的热量以进行反应。同时,它防止产物气体与含氧剂接触。该反应堆允许转换低价燃料,并且通过加入石灰石将污染性硫化学键合。

著录项

  • 公开/公告号AU5928380A

    专利类型

  • 公开/公告日1980-12-18

    原文格式PDF

  • 申请/专利权人 RHEINISCHE BRAUNKOHLENWERKE A.G.;

    申请/专利号AU19800059283

  • 发明设计人 E. PATTAS;B. RUTER;H. J. SCHARF;

    申请日1980-06-13

  • 分类号C10J3/54;C10J3/56;F02C3/28;

  • 国家 AU

  • 入库时间 2022-08-22 15:42:21

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号