首页> 外国专利> Operating process for forced circulation boiler - involves measures to maximise water content on shut-down in boiler with radiant contact evaporators in parallel

Operating process for forced circulation boiler - involves measures to maximise water content on shut-down in boiler with radiant contact evaporators in parallel

机译:强制循环锅炉的运行过程-涉及采取措施,使带有辐射接触式蒸发器的锅炉并联停机时水含量最大化

摘要

The operating scheme for a forced-circulation steam generator is for units with economiser, parallel radiant and contact evaporators, and superheater in series; a water separator is between the evaporators and superheater, with possible arrangements for recirculating water to the evaporators. After cessation of firing, feeding and steam offtake, the separator (11) water level is allowed to rise to just below the connection to the superheater (7). Any surplus water is then discharged via the separator drains (30,31). Additionally, the economiser pressure-relief arrangements comprise a cross-connection (36) with valves (34,37), linking the economiser and superheater venting lines (33,38). The saturated steam to the superheater line (24) is raised above the economiser inlet level.
机译:强制循环蒸汽发生器的运行方案适用于带有节能器,并联辐射和接触式蒸发器以及串联过热器的机组。在蒸发器和过热器之间有一个水分离器,并有可能将水再循环到蒸发器。在停止燃烧,进料和排出蒸汽之后,使分离器(11)的水位上升到刚好与过热器(7)的连接之下。然后,多余的水通过分离器的排水口(30,31)排出。另外,节能器泄压装置包括带有阀(34,37)的交叉连接(36),该阀连接节能器和过热器排气管线(33,38)。进入过热器管线(24)的饱和蒸汽升高至节能器进口水位以上。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号