首页>
外国专利>
Broad-foot concrete foundation pile - is cast in-situ after drilling with lost-point drill head on tube, head producing void on withdrawal
Broad-foot concrete foundation pile - is cast in-situ after drilling with lost-point drill head on tube, head producing void on withdrawal
展开▼
机译:阔脚混凝土基础桩-钻孔后在现场浇铸,失点钻头放在管上,钻头撤离时会产生空隙
展开▼
页面导航
摘要
著录项
相似文献
摘要
The arrangement is intended for producing a reinforced concrete foundation pile in the ground with a broad lower end. A steel tube (2) carries a conical helical drilling head (3;4,5), with a loose point (6) coupled to the head via circumferentially acting one-way stops (7). The point is left on withdrawal of the tube, after the reinforcement is placed and concrete poured. The tube is screwed down under axial pressure. When the required depth is reached, it is unscrewed under upward axial force which is such that the tube moves upwards at greater rate than determined by the screw pitch of the drilling head, thus producing a void in the lower end of the bore hole. This void fills with concrete to produce the broad foot which provides a calculable increase in effective bearing load.FL.
展开▼